The Town of Hollywood Park requires permits for a variety of projects, for example Building Projects, Tree Trimming/Cutting, Septic System Installation. It is the Contractor’s responsibility to obtain the appropriate permit prior to beginning any project within Hollywood Park, of course the Homeowner must also ensure the vendor they hired has obtained the proper permit from City Hall before starting work on their property. If you are unsure if a permit is required for an upcoming project, please review the City Ordinances section of this website or call City Hall at 210-494-2023 ext. 224 for further information.

 

Cover sheet pamphlet

 

BUILDING PERMIT APPLICATION PROCEDURES

Permits are issued at the Town of Hollywood Park City Hall during normal operating hours. Click for a sample permit application.

The completed application, floor plans, or other supporting documentation are to be submitted to City Hall for review by the Building Inspector. Upon inspector approval, the Contractor will be notified of the cost of the permit and will be issued upon receipt of the appropriate fees.

If you fail to obtain a permit, you can “be fined a sum not to exceed $2,000.00 for each violation. Each and every day of violation shall constitute a separate offense and shall be punishable accordingly.” (Sec.14-58)

SCHEDULE OF PERMIT FEES

A schedule of the permit fees is available by clicking the following links:

BUILDING PERMIT FEE SCHEDULE

CERTIFICATE OF OCCUPANCY

FEE SCHEDULE 10-21-14

ON-SITE SEWAGE FACILITY (SEPTIC) CONSTRUCTION PERMIT & LICENSE

A person may not construct, alter, repair, extend, or operate an On-Site Sewage Facility System without obtaining a permit and having plans approved.

For procedures and a permit application please click here

For information regarding Septic Systems….http://water.epa.gov/infrastructure/septic/septicsmart.cfm

 

OAK TREE TRIMMING / CUTTING PERMIT

In an attempt to control Oak Wilt, the Hollywood Park City Council passed an Ordinance #585 requiring the following:

  • Commercial tree trimmers must obtain a tree trimming permit at a cost of $55.00
  • All equipment used for tree trimming must be properly disinfected before use.
  • All cuts must be painted within 30 minutes of making the cut (paint all cuts before moving from one tree to the next).
  • All brush must be hauled by the tree trimming company
  • The permit is only good for ten (10) days.
  • HOMEOWNERS DECIDING TO DO ANY TREE PRUNING OR CUTTING THEMSELVES MUST OBTAIN A PERMIT ONLINE OR FROM CITY HALL.  THERE IS NO CHARGE FOR THIS PERMIT.

  It is the responsibility of the tree trimming company in addition to the Homeowner, to obtain the permit prior to starting   any trimming. Failure to comply with the ordinance shall result in charges being filed against the tree trimmer and/or the Homeowner.

*UPDATE* As per Ordinance #943, Oak trees growing on private property may only be cut or trimmed from July 1st through January 31st.

Ordinance 943 – Amending Ch. 72, Oak Tree Care and Oak Wilt Prevention